广州大学城区域供冷冰蓄冷系统
(Guangzhou university town DCS/ITS system)

 


广州大学城拟建建筑面积724万m2,建成后将有500万m2的建筑纳入区域供冷系统,总制冷总装机容量11.7万RT,分4个集中冷站,第1冷站采用溴化锂和常规电制冷机组,2-4冷站采用冰蓄冷系统,总蓄冰量达到25.2万RTh,建成后将成为全球第二大冰蓄冷区域供冷系统,仅次于美国芝加哥市UNICOM区域供冷项目(31万RTh)。

The Guangzhou university town campus(GUC) is covering the area of building about 7240,000 m2, in which there will be about 5000,000 m2 being supplied with the cooling water from the 4 cooling plants set in the town.

The total chiller capacity is 112 thousand RT and the ice chiller will be 25.2RTh , which is the second large of scale over the world.

Our company is being responsible for the whole planning of the plants to the 400 heat exchanging stations, designing the flow of the cooing system including the mechanical and the automation system, supplying the automation components used for controlling all the equipments in the plants and the cooling water meter system in the whole town.

2004年2月18日,各冷站主机、蓄冰装置、板换和自控、集成为一个大包全球招标,参加竞标的有全球七家顶尖的制冷设备供应商组成的联合体。我公司负责系统集成和自控系统,需进行全部的机械和自控系统设计,包括制冷站内以及到约400个换热站的控制等,并负责自控设备供货,和美国约克公司、BAC公司组成联合体投标,经15名权威专家评审,夺得第一名并中标。2004年4月5日,我公司向业主提交了对投标方案和专家意见综合考虑后的深化方案,接受业主召集的国内18位专家再次评审,并获得通过,项目进入实施阶段。

该项目建成以后,整个区域供冷系统将在一个总控制中心的控制下工作,并在大屏幕上清晰地显示系统的运行状况。采用冰蓄冷系统实现稳定的2oC供水,相比常规系统减小了管径和水输送功耗,可以大幅度减少初投资和运行费用,同时冰蓄冷系统对当地电网的移峰填谷将起到明显作用。自控系统总控制点数10200点,控制层采用PROFIBUS-DP总线,管理网应用工业以态网、大型控制器和冗余技术,多工作站、多控制分站,一个控制总站。控制对象包括冷站系统、末端冷热量计费管理、末端管网和三级泵水系统控制等。

根据测算,通过区域集中供冷,项目初投资比建筑物单独设置中央空调可节省总投资1.3亿元,节省中央空调机房用房5.5万平方米,因节省用电减少大学城装机容量5.2万千瓦,减少相关变压器、电线等输变电设施投资约1.7亿元;每年减少空调维护费用2000万元以上;系统运行成本比单体建筑设置中央空调降低28%。

广州大学城由十余所大学及中心区构成,一期将于2004年9月1日开始逐步投入使用。


西柏坡发电厂1、2炉300MW气力输送系统

 


采用多泵制正压浓相气力输送系统;

水平输送距离约550米,垂直拔高约35米;

系统最大出力达:69吨/小时;

系统运行稳定、可靠;

配置了远程监控系统。


湖北文化城蓄能空调 (Hubei culture plaza)

 


  该工程为全国最大的蓄冷蓄热联合工程,也是华源公司在中南地区的样板工程。

  湖北出版文化城总建筑面积为33万m2,一期为15万m2,其中包括公寓写字楼为19000m2,裙楼为60000m2,普通写字楼为19000m2,中央空调夏季设计日峰值冷负荷为14841kW,冬季设计日尖峰热负荷为5340kW,采用蓄冷蓄热空调方式。

This is the Chinese largest project applied thermal storage AC system, of which the total area is bigger than 300 thousands m2 and 150 thousands m2 of the first phase carried on by us as an overall contractor. Coil storage chiller and electric boilers have been used.


浙大新校区冰蓄冷
(DCS of Zhejiang university new campus)

 


  浙江大学是全国最大的综合性大学,三墩新校区是浙大为提升教学质量、造就一流学府所做的重大基础建设,属国家重点投资项目。新校区一期占地4000亩,包括图书馆、体育馆、教学楼、试验楼、食堂等众多建筑,建设规模宏大。

  中央空调采用区域供冷冰蓄冷系统总计约16万平方米,分为动力中心和学生村食堂两部分。目前投入运行3台550RT、2台320RT双工况冷水机组,设计蓄冰装置超过12000RTH。

  本工程对于国内各类院校具有极大的示范作用。

Zhejiang University is one of the most famous universities in China. The new campus is a Chinese key project invested by central government. The total area is larger than 2700 thousand square meter, the thermal storage DCS supplies cooling water to buildings covering more than 160 thousand square meter including library, gym, teaching building, laboratory, dining hall and etc. The DCS is now employing 3 chillers of 550RT and 2 Chillers of 320RT with a coil chiller of 12000RTh. This project has been an exemplification of Chinese universities.


上海科技城冰蓄冷系统
( Shanghai science museum AC system)

 


  上海市2000年1号工程,2001年10月APEC会议在此召开,党和国家领导人均对此工程高度重视。总建筑面积近10万m2,是目前国内蓄冰量最大的样板工程之一。

  目前,该工程作为上海市的科普教育基地,汇集了自然科学、人文科学以及历史知识等方面众多项目,每天接纳大批中外参观、学习者,在全国具有极高的知名度。

This building is the No. 1 key project of Shanghai, in which 2001 Asia Pacific Economic Cooperation (APEC) held the conference. The total area is about 100 thousands m2

The museum is now the Shanghai base of popular science where you can learn kinds of natural knowledge or artificial scenes and it is crowded with visitors come from all around the world everyday.