广州大学城拟建建筑面积724万m2,建成后将有500万m2的建筑纳入区域供冷系统,总制冷总装机容量11.7万RT,分4个集中冷站,第1冷站采用溴化锂和常规电制冷机组,2-4冷站采用冰蓄冷系统,总蓄冰量达到25.2万RTh,建成后将成为全球第二大冰蓄冷区域供冷系统,仅次于美国芝加哥市UNICOM区域供冷项目(31万RTh)。
The Guangzhou university town campus(GUC) is covering the
area of building about 7240,000 m2, in which there will be
about 5000,000 m2 being supplied with the cooling water from
the 4 cooling plants set in the town.
The total chiller capacity is 112 thousand RT and the ice
chiller will be 25.2RTh , which is the second large of scale
over the world.
Our company is being responsible for the whole planning of
the plants to the 400 heat exchanging stations, designing
the flow of the cooing system including the mechanical and
the automation system, supplying the automation components
used for controlling all the equipments in the plants and
the cooling water meter system in the whole town.
2004年2月18日,各冷站主机、蓄冰装置、板换和自控、集成为一个大包全球招标,参加竞标的有全球七家顶尖的制冷设备供应商组成的联合体。我公司负责系统集成和自控系统,需进行全部的机械和自控系统设计,包括制冷站内以及到约400个换热站的控制等,并负责自控设备供货,和美国约克公司、BAC公司组成联合体投标,经15名权威专家评审,夺得第一名并中标。2004年4月5日,我公司向业主提交了对投标方案和专家意见综合考虑后的深化方案,接受业主召集的国内18位专家再次评审,并获得通过,项目进入实施阶段。
该项目建成以后,整个区域供冷系统将在一个总控制中心的控制下工作,并在大屏幕上清晰地显示系统的运行状况。采用冰蓄冷系统实现稳定的2oC供水,相比常规系统减小了管径和水输送功耗,可以大幅度减少初投资和运行费用,同时冰蓄冷系统对当地电网的移峰填谷将起到明显作用。自控系统总控制点数10200点,控制层采用PROFIBUS-DP总线,管理网应用工业以态网、大型控制器和冗余技术,多工作站、多控制分站,一个控制总站。控制对象包括冷站系统、末端冷热量计费管理、末端管网和三级泵水系统控制等。
根据测算,通过区域集中供冷,项目初投资比建筑物单独设置中央空调可节省总投资1.3亿元,节省中央空调机房用房5.5万平方米,因节省用电减少大学城装机容量5.2万千瓦,减少相关变压器、电线等输变电设施投资约1.7亿元;每年减少空调维护费用2000万元以上;系统运行成本比单体建筑设置中央空调降低28%。
广州大学城由十余所大学及中心区构成,一期将于2004年9月1日开始逐步投入使用。
|